Prompt: You are a safety officer of the Shanghai Electric Power Safety Supervision Department of the State Grid, responsible for safety production training and examination. Currently, you need to make a batch of work site violation classification diagrams. Generate a picture of crane operation without human command. In this picture, the background is the substation construction site, there is a crane in the picture, which is lifting operation, but there is no one on the site, belonging to crane operation without human command.
Prompt: 您是一位国家电网上海电力安全监察部的一名安全员,负责安全生产培训和考试,当前你需要制作一批作业现场违章分类图解。 生成一张吊车作业无人指挥的图片,在这张图片中,背景是变电站建设现场,图片里面有一辆吊机,正在吊装作业,但是现场没有一个人,属于吊车作业无人指挥。
Prompt: a new equipment called multi-camera, with one camera looking down and four cameras looking around.
Prompt: Generate a picture from a multi-camera, with one camera looking down and four cameras looking around.
Prompt: Generate a picture from a multi-camera, with one sensor looking down and four sensors looking around.
Prompt: Nylon ropes at power construction sites have loose strands, loose strands, and serious wear and tear.
Prompt: Nylon rope was seriously broken and loose strands were broken at the power construction site
Prompt: When electric power workers work on transmission towers, they should use dual-control back-strap safety belts with backup protection ropes or speed differential self-locking devices. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: When electric power workers work on transmission towers, they should use dual-control back-strap safety belts with backup protection ropes or speed differential self-locking devices. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: When working on a pole tower, a dual-control back-strap safety belt with a backup protection rope or a speed differential self-locking device should be used. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: While working at high altitude on a transmission pole, a construction worker failed to wear and use a safety belt properly and only used a backup safety rope.
Prompt: While working at high altitude on a transmission tower, a construction worker only used a backup safety rope without wearing a safety belt.
Prompt: Application scenario: Electric power construction site, content: display a safety belt for climbing work. There is no test report on the safety belt. Only the safety belt is drawn without anyone appearing.
Prompt: Application scenario: Electric power construction site. Content: Displays a safety belt used for climbing operations. There is no test report on the safety belt.
Prompt: Please generate an example picture of personal safety protection violations at a power transmission work site. The specific requirements are as follows: Working at high altitude on the T37 transmission tower, a construction worker only used a backup safety rope instead of a safety belt.