Prompt: Nylon rope was seriously broken and loose strands were broken at the power construction site
Prompt: Nylon ropes at power construction sites have loose strands, loose strands, and serious wear and tear.
Prompt: While working at high altitude on a transmission tower, a construction worker only used a backup safety rope without wearing a safety belt.
Prompt: While working at high altitude on a transmission pole, a construction worker failed to wear and use a safety belt properly and only used a backup safety rope.
Prompt: Application scenario: Electric power construction site. Content: Displays a safety belt used for climbing operations. There is no test report on the safety belt.
Prompt: When electric power workers work on transmission towers, they should use dual-control back-strap safety belts with backup protection ropes or speed differential self-locking devices. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: When electric power workers work on transmission towers, they should use dual-control back-strap safety belts with backup protection ropes or speed differential self-locking devices. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: Please generate an example picture of personal safety protection violations at a power transmission work site. The specific requirements are as follows: Working at high altitude on the T37 transmission tower, a construction worker only used a backup safety rope instead of a safety belt.
Prompt: When working on a pole tower, a dual-control back-strap safety belt with a backup protection rope or a speed differential self-locking device should be used. When the backup protection rope exceeds 3m, a buffer should be used. Seat belts and backup protection ropes should be hung on fasteners at different parts of the tower. The backup protection rope is not allowed to be used for docking.
Prompt: Application scenario: Electric power construction site, content: display a safety belt for climbing work. There is no test report on the safety belt. Only the safety belt is drawn without anyone appearing.
Prompt: Nine pipes of nine colors, one to two meters in diameter, came out of the building and fell to the ground. The nine pipes wound and circled like snakes from the wall to the ground, some seemed to emerge from the ground, some pipes climb very high, some very low, so they climbed on the ground 10 meters distance
Prompt: Nine pipes of nine colors, one to two meters in diameter, come out of the building and fall to the ground. Then, the nine pipes wind around the ground like snakes, some seemed to emerge from the ground, some pipes climb very high, some very low, so they climbed on the ground 10 meters distance
Prompt: Nine black pipes, eight meters long and one meter in diameter, came out of the same opening in the building's exterior wall and fell to the ground continuously. These pipes wrapped around the ground like snakes, with some density and some height, extend beyond 8 meters
Prompt: Nine black pipes, eight meters long and one meter in diameter, came out of the same opening in the building's exterior wall and fell to the ground continuously. These pipes wrapped around the ground like snakes, with some density and some height, extend beyond 8 meters
Prompt: Five six-meter-long, one-meter-wide red metal exhaust pipes, wrapped around each other, fell from the building's exterior walls and fell to the ground, then wrapped together like five snakes and stretched out six meters
Prompt: Five six-meter-long, one-meter-wide red metal exhaust pipes, wrapped around each other, fell from the building's exterior walls and fell to the ground, then wrapped together like five snakes and stretched out six meters
Negative: Five pipes are straight
Prompt: Using pipes, twine, mirrors and cloth of different thicknesses, interlacing and winding in the air, and then producing a contemporary installation art work in a modernist style
Prompt: A tangled mess of cable wires were captured in stark relief against a dingy concrete wall, depicted in a gritty, industrial style reminiscent of machinic photography, backlit with harsh, unforgiving fluorescent lighting that accentuated every kink and bend.
Prompt: Nine eight-meter-long, one-meter-diameter black pipes, which came out of the same opening in the building's exterior wall and fell to the ground, were coiled like snakes and stretched out to eight meters away
Prompt: 10 pipes of different colors and thicknesses, come out of the building's exterior walls and fall to the ground, and then, the 10 pipes wind around the ground like snakes, circling, rising and falling, it extends 8 meters on the ground
Prompt: 108/2000 Ten red pipes, 20 meters long and 1 meter in diameter, snake around each other, coming out of the building's exterior walls and falling to the ground, then extending 10 meters to the front
Prompt: Ten pipes of different colors and thicknesses snake out of the building's exterior and fall to the ground. Then, the nine pipes snake from the wall to the ground, they crawled a distance of 10 meters on the ground
Prompt: Ten pipes of different colors and thicknesses, come out of the building's exterior walls and fall to the ground. Then, together, the nine pipes wind like snakes from the wall to the ground, hovering, rising and falling, they crawled a distance of 10 meters on the ground
Prompt: Ten pipes of different colors and thicknesses, come out of the building's exterior walls and fall to the ground. Then, together, the nine pipes wind like snakes from the wall to the ground, hovering, rising and falling, they crawled a distance of 10 meters on the ground
Prompt: Nine six-meter-long, one-meter-diameter, tinfoil-lined, red pipes that came out of the same exit on the outside of the building and fell to the ground, entwined like nine snakes, there is a high-bottomed undulation relationship, extending forward to 5 meters away
Prompt: Nine six-meter-long, one-meter-diameter, tinfoil-lined, red pipes that came out of the same exit on the outside of the building and fell to the ground, entwined like nine snakes, there is a high-bottomed undulation relationship, extending forward to 5 meters away
Prompt: A series of pipes of different colors and thicknesses, crisscrossing the ground like snakes, form a large 10-meter-high installation
Prompt: Nine purple pipes, one to two meters in diameter, came out of the building and fell to the ground. Then, the nine pipes twisted and circled on the ground like snakes, some like coming out of the ground, some pipes climbed very high, some very low, so they climbed on the ground 10 meters distance
Prompt: A number of pipes of different colors and thicknesses coiled up and down the ground like snakes, forming a large installation
Prompt: Nine pipes of nine colors, one to two meters in diameter, come out of the building and fall to the ground. Then, the nine pipes wind like snakes from the wall to the ground, up and down, they crawled 10 meters on the ground
Prompt: Rats chew Internet wires in the server room Stable diffusion, torn wire, many torn wires, rats chew wires, show teeth
Prompt: Ten pipes of different colors and thicknesses come out of the building's outer walls and fall to the ground. Then, the nine pipes wind like snakes from the wall to the ground, circling and rolling up and down, they crawled a distance of 10 meters on the ground
Prompt: Thousands of pink pipes, broken out of the walls and falling to the clean concrete floor, were strung in groups of five, two and one, coiled like snakes, it varies in height and extends 10 meters on the ground
Prompt: Twenty Red 1-meter-diameter pipes, running down the building's exterior walls, snake around each other for 10 meters